Each package names the primary deliverable, the minimum input set and the evidence class it can support. Planning values are not published as certified performance claims.

Service package Primary engineering question Minimum inputs Evidence class
Density & selectivity review Can inventory cube utilization rise without erasing fire, maintenance and recovery access? SKU velocity, load rating, aisle widths, expansion intent Concept boundary report
Throughput validation Does design rate hold across the sustained peak with stated mix and buffers? Order profile, replenishment, peak duration, divert/merge logic Scenario and sensitivity record
Controls interface readiness Who owns command, confirmation, timeout, alarm and restart for each handshake? WMS/WCS/WES/PLC/robot message list Responsibility matrix + FAT script
Brownfield cutover planning How does live fulfillment stay protected during staged release? Zone map, fallback states, commissioning windows Cutover and rollback plan
Lifecycle serviceability What spares, access and diagnostics keep mean time to repair within the agreed exposure? Asset list, duty cycle, local skill model Serviceability and spares matrix
Methodology

Five steps from operating data to acceptance gates

  1. Frame the operating profile

    Capture load units, SKU velocity, order-line distribution, peak window, temperature zones and the longest tolerable interruption for each critical flow path. Mark unknowns as assumptions with owners.

  2. Bound the storage and robot concept

    Relate inventory cube utilization to selectivity, rack geometry, fire routes and recovery access. Separate greenfield freedom from brownfield aisle, floor and column constraints.

  3. Map controls ownership

    Document WMS, WCS, WES, PLC and fleet or AS/RS controller responsibilities for release, routing, confirmations, alarms and restart authorization before interface definitions freeze.

  4. Run scenario and FAT evidence

    Exercise baseline, peak and disturbance cases in the Digital Twin Lab or equivalent emulation path. Record expected versus observed states for FAT-relevant interfaces.

  5. Close SAT and service handover

    Repeat applicable checks with installed geometry and real loads. Transfer diagnostics, critical spares guidance and recovery procedures with clear ownership after go-live.

Request a scoped service review

Send the data that defines available and accepted

Include the operating calendar, storage concept, interface list and the acceptance questions that must be closed before cutover. Assumptions can remain provisional if they are labeled.